WORKSHOP CONTROL // TRUE 4-STAGE PIPELINE

OVERHAUL OPERATIONS & JOB CARDS

VOICE TEARDOWNYARD STOCK
ACTIVE REPAIR JOBS
4
Units currently in facility
PIPELINE QUOTE VALUE
AED 13,050
Active overhaul WIP contracts
TEST BENCH QA
1
Hydro & Megger clearance
ACTIVE METALLIC QR TAGS
1
180-day automated dispatch
STAGE 1: INWARD GATE PASS1
RECEIVING & INTAKE
JOB-2026-01122026-10-24

KSB Meganorm 50-200 End-Suction

Emirates Chemical & Water Treatment

"Delivering only 15 m³/h instead of 45 m³/h rated flow. Cavitation noise."

PENDING TEARDOWN
SEND PASS VIA WHATSAPP
STAGE 2: TEARDOWN & QUOTING1
AI VOICE NOTES
JOB-2026-01042026-10-22

Grundfos CR 15-3 Multistage

Gulf Contracting & MEP Services

"Mechanical seal leaking water onto baseplate, heavy vibration at 2900 RPM."

SHAFT RUNOUT:0.04 mm
STAGE 3: TEST BENCH QA1
ISO MEGGER & RUNOUT
JOB-2026-00982026-10-18

Perkins 250kVA Soundproof Genset

Al-Marwan Quarry & Crushing LLC

"Lube oil pressure drops to 1.8 bar under full 200kW load. Black smoke emission."

MEGGER INSULATION:450 MΩ
AED 7,000 APPROVED
STAGE 4: DELIVERY & QR TAG1
PM TIMER ACTIVE
JOB-2026-00892026-10-12

Siemens 45kW 4-Pole Motor (112M)

Sharjah Precast Concrete Works

"Phase failure tripped main breaker. Burning smell from terminal box."

SHAFT RUNOUT:0.015 mm
MEGGER INSULATION:650 MΩ
AED 4,000 APPROVED